Willys Wagon

Willys Wagon RSS Feed
 
 
 
 

Hot Rodding the Eazy Project (Dad’s Truck)

Took some parts off a engine I had in my shop whose pistons split apart (literally) It had a carburetor from a Jeepster on it, and a intake manifold from the same. A vacuum advance distributor was also installed. On top of all this it has a Kaiser Supersonic head was installed (higher compression).

Since my dad’s truck wasn’t running the best with the stuff it had on it, I decided to take the parts from the other engine and install it on the Eazy Project to get a little better performance.

Took only about 9 hours to swap everything over, that’s including cleaning and watching paint dry.

New points, rotor, cap, and wires were also used. Runs great, but still need to fix a few things with the throttle linkage.

Duration : 0:1:1


Technorati Tags: , , , , , , , , , , , , , , ,

One Response to “Hot Rodding the Eazy Project (Dad’s Truck)”

  1. Raptor22f Says:

    How’s the Flying …
    How’s the Flying Hammer progressing? Anything done to it lately?

Leave a Reply